MAINTENANCE OPERATIONS

Dashboard overview

Dashboard Owner: Unassigned
Tue, 24 Nov 2026

Engineer tasks

Separate tracker for engineering work, task type and status.

23%completed
Total35
Open/Pending17
In Progress10
Closed/Completed8

Purchase items

Separate tracker for purchase requirements and status.

54%delivered
Total41
RFQ5
Issue PR5
Waiting parts9
Delivered22

Maintenance Dashboard

Monitor task completion and upcoming maintenance activity.

Total jobs ▦
45
100% of all jobs
Click to view all jobs
Open/Pending jobs ◷
17
38% of all jobs
Click to view open/pending jobs
In Progress jobs ↻
1
2% of all jobs
Click to view in progress jobs
Close/Completed jobs ✓
27
60% of all jobs
Click to view close/completed jobs

Dashboard filters

Filter performance by period, selected week and maintenance section.

Current month (2026) · All sections · 35 matching records

Maintenance activity

Maintenance activity — January to December 2026

Batch PlantFurnaceBathLehrCVDCold end
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sept
Oct
Nov
Dec

Maintenance activity

Completion status — January to December 2026

60%completed
Total jobs45
Open/Pending jobs17
In Progress jobs1
Close/Completed jobs27

Weekly maintenance interface

Click a maintenance task to copy it, then click a date cell to paste it. Left-click an arrow to edit; right-click it to change status. Drag an arrow to reschedule.

Section (multiple selection)
All category (multiple selection)
▶Blue — Scheduled / In Progress
▶Green — Completed
▶Red — Overdue
◆Diamond — One-day job
━Line — Job continues across dates
Week 48 · 2026 · 23 Nov 2026 – 29 Nov 2026 · Monday to Sunday
▶Blue — Scheduled / In Progress
▶Green — Completed
▶Red — Overdue
◆Diamond — One-day job
━Line — Job continues across dates
No.Job / TaskSectionEquipment / AssetManpowerMonday
23 Nov 2026
Tuesday
24 Nov 2026
Wednesday
25 Nov 2026
Thursday
26 Nov 2026
Friday
27 Nov 2026
Saturday
28 Nov 2026
Sunday
29 Nov 2026
1
PM Routine
Batch PlantEV weighing DolomiteWan MH & Team——————
2
PM Finding Repair
Batch PlantEV weighing DolomiteWan MH & Team——————
3
PM Routine
Batch PlantEV gathering CV & mixerWan MH & Team——————
4
PM Finding Repair
FurnaceBatch Charger 1-4Syed & Haikal—————
5
Support & assist Operation/Mechanical
FurnaceFiring Exchange valve 4P RightSyed & Haikal——————
6
PM Routine
BathO2 analyser for N2 & H2OGM/Syed & Haikal——————
7
TRT/Hot Clean
BathBlower HP, BBCFShift Utility——————
8
TRT/Hot Clean
Cold end5D ScannerJoseph & Zuhairi————
The weekly view updates automatically when records are added or edited.

Upcoming & recently updated

Equipment / taskDue dateFrequencyAssigned toStatus
⚙
Replace exchange valveFiring Exchange valve 4P Right · Support & assist Operation/Mechanical
27 Nov 2026One-offSyed & HaikalOpen/Pending
⚙
Replace blower fan EV weighing DolomiteEV weighing Dolomite · PM Finding Repair
24 Nov 2026MonthlyWan MH & TeamOpen/Pending
⚙
Assist Changeover blower BathBlower HP, BBCF · TRT/Hot Clean
19 Nov 20262weekShift UtilityOverdue
⚙
Weight test and calibrationWeighing system Raw material · PM Routine
17 Nov 20266monthSyed & HaikalClose/Completed
⚙
Lay new cable for emergency siren and testEmergency Siren · PM Finding Repair
30 Nov 2026 – 02 Dec 2026One-offSyed & HaikalOpen/Pending
Demo data is provided to help you explore the dashboard. Replace it with your own records, or clear the sample records in Data & backup. Dates and KPIs update from your records.

Maintenance records

Create, update, search and manage your maintenance tasks.

No.Job / TaskPlanned date (From – To)FrequencyManpowerStatusActions
1
⚙
Cleaning Hopper Dust CollectorDC Main BP · PM Routine
27 Oct 2026MonthlyWan Mahassan
2
⚙
H2 analyser line 1 & 2 calibration by OGMH2 analyser Gas Mixing Room · TRT/Hot Clean
26 Oct 2026YearlyOGM & Haikal
3
⚙
Top Roll 5A Swap with spare unitTop Roll 5A · TRT/Hot Clean
26 Oct 2026QuarterlyHaikal
4
⚙
Spare part list ElectricalBatch Plant area · PM Routine
26 Oct 2026 – 30 Oct 2026DailyHaikal
5
⚙
PM CheckingCullet Conyevor system · PM checking (Checksheet)
28 Oct 2026MonthlyHaikal
6
⚙
Cleaning hopper Dust CollectorDust Collector 1 · PM Routine
24 Oct 2026MonthlyWan Mahassan
7
⚙
Cleaning hopper Dust collectorDust Collector 2 · PM Routine
24 Oct 2026MonthlyWan Mahassan
8
⚙
SIP project Smoke DetectorHot end Smoke Detector · Safety Improvement Plan (Special Job)
04 Nov 2026 – 07 Nov 2026One-offSyed & Haikal
9
⚙
LOTO Mixer 3Mixer 3 · Support & assist Operation/Mechanical
28 Oct 20262weekHaikal
10
⚙
Replace exchange valveFiring Exchange valve 4P Left · Support & assist Operation/Mechanical
29 Oct 2026One-offHaikal
11
⚙
Weight test and calibrationWeighing system Raw material · PM Routine
17 Nov 20266monthSyed & Haikal
12
⚙
5S housekeepingAll Dust Collector · 5S & Housekeeping
03 Nov 2026One-offWan Mahassan & Team
13
⚙
Replace ITV monitor - 4pcsITV Camera CCTV system · Corrective/Repair Maintenance
02 Nov 2026One-offHaikal & Fazreen
14
⚙
Assit Swap Top roll 5A & 5CTop Roll 5A & 5C · TRT/Hot Clean
03 Nov 2026QuarterlyShift Utility
15
⚙
Repair install bracket solenoid valveBatch Charger 1-4 · PM Finding Repair
10 Nov 2026 – 14 Nov 2026One-offSyed & Haikal
16
⚙
Replace Lehr Break sensor centreLehr Break 1 · TRT/Hot Clean
11 Nov 2026One-offSyed & Haikal
17
⚙
Cleaning ITV PanelITV Camera CCTV · PM Routine
30 Oct 2026MonthlySyed & Haikal
18
⚙
Check TC A zone Top Right & Adjust positionLehr TC A zone Top Right · TRT/Hot Clean
03 Nov 2026One-offProduction
19
⚙
Assist Changeover blower BathBlower HP, BBCF · TRT/Hot Clean
03 Nov 20262weekShift Utility
20
⚙
PM checking Batch PlantBatch Plant area · PM checking (Checksheet)
02 Nov 2026MonthlyHaikal
21
⚙
Check Heater A zone Top B, C, DLehr Heater A zone Top B, C, D · TRT/Hot Clean
03 Nov 2026One-offSyed & Haikal
22
⚙
Test and Replace blower fanEV Weighing Dolomite · Corrective/Repair Maintenance
04 Nov 2026 – 05 Nov 2026One-offWan Mahassan/Syed & Haikal
23
⚙
Check damper C zone bottom rightLehr damper C zone bottom Right · TRT/Hot Clean
03 Nov 2026MonthlySyed & Haikal
24
⚙
O2 analyser calibration by OGMO2 analyser for N2 & H2 · PM Routine
26 Nov 2026YearlyOGM/Syed & Haikal
25
⚙
Replace heater A zone Top B1Lehr Heater A zone Top B1 (FR1) · TRT/Hot Clean
03 Nov 2026One-offSyed & Haikal
26
⚙
PM checking Lehr areaLehr area · PM checking (Checksheet)
03 Nov 2026MonthlySyed & Haikal
27
⚙
PM checking Batch PlantSilica sand area · PM checking (Checksheet)
05 Nov 2026MonthlySyed & Haikal
28
⚙
Check Heater A zone Top & BottomLehr Heater A zone Top & Bottom · TRT/Hot Clean
11 Nov 2026One-offSyed & Haikal
29
⚙
PM checking cullet conveyor systemCullet Conveyor system · PM checking (Checksheet)
12 Nov 2026MonthlySyed & Haikal
30
⚙
Replace Lehr Break sensor centre & rightLehr Break 1 · TRT/Hot Clean
19 Nov 2026One-offSyed & Haikal
31
⚙
Annual servicing & calibration5D Scanner · TRT/Hot Clean
25 Nov 2026 – 27 Nov 2026YearlyJoseph & Zuhairi
32
⚙
Replace Thermocouple Tin Bay 13LTin Bay 13L · TRT/Hot Clean
11 Nov 2026One-offShift Utility
33
⚙
PM checking batch plant areaBatch Plant area · PM checking (Checksheet)
10 Nov 2026MonthlySyed & Haikal
34
⚙
Assist Changeover blower BathBlower HP, BBCF · TRT/Hot Clean
19 Nov 20262weekShift Utility
35
⚙
Cleaning and Servicing EV weighing DolomiteEV weighing Dolomite · PM Routine
23 Nov 2026MonthlyWan MH & Team
36
⚙
Replace blower fan EV weighing DolomiteEV weighing Dolomite · PM Finding Repair
24 Nov 2026MonthlyWan MH & Team
37
⚙
Cleaning and Servicing EV gathering CV & mixerEV gathering CV & mixer · PM Routine
27 Nov 2026MonthlyWan MH & Team
38
⚙
PM checking batch plant areaBatch Plant area · PM checking (Checksheet)
16 Nov 2026MonthlySyed & Haikal
39
⚙
PM checking Distributor, Batch & B+C areaDistributor, Batch & B+C area · PM checking (Checksheet)
18 Nov 2026MonthlySyed & Haikal
40
⚙
PM checking bath areaBath area · PM checking (Checksheet)
20 Nov 2026MonthlySyed & Haikal
41
⚙
Assit Swap Top roll 6A & 6CTop Roll 6A & 6C · TRT/Hot Clean
19 Nov 2026QuarterlyShift Utility
42
⚙
Assist Changeover blower BathBlower HP, BBCF · TRT/Hot Clean
26 Nov 20262weekShift Utility
43
⚙
Repair install bracket solenoid valveBatch Charger 1-4 · PM Finding Repair
25 Nov 2026 – 27 Nov 2026One-offSyed & Haikal
44
⚙
Lay new cable for emergency siren and testEmergency Siren · PM Finding Repair
30 Nov 2026 – 02 Dec 2026One-offSyed & Haikal
45
⚙
Replace exchange valveFiring Exchange valve 4P Right · Support & assist Operation/Mechanical
27 Nov 2026One-offSyed & Haikal
Showing 45 of 45 recordsUse Edit to update a task.

Engineer tasks & purchase items

Separate records from the weekly maintenance schedule. Each list has its own task, task type and status.

Add engineer task

Record an engineering task and track progress.

Add purchase item

Track a purchase requirement separately.

Engineer task register

Use Edit to change the task, task type or status. Click a dashboard summary to open matching records.

No.What task?Task typeStatusActions
1Update Yield loss October 2026Maintenance Report
2H2 analyser calibration jobMaintenance work
3Create and establish SOP weighing calibration Batch PlantSOP document
4Weighing calibration batch plant job Nov 2026 17/11/2026Maintenance work
5Update and compile PM Dust collector September 2026Performance Monitoring Report
6Update and compile PM Dust collector October 2026Performance Monitoring Report
7Update spare part list Batch PlantMaintenance inventory
8Update spare part list FurnaceMaintenance inventory
9Update spare part list BathMaintenance inventory
10Update spare part list LehrMaintenance inventory
112F PCP Screw conveyor modification project (CAPEX)Maintenance Improvement Project
12O2 analyser calibration jobMaintenance work
135D scanner annual calibration and service + PC slave issue (25~27/11)Maintenance work
14SIP - Smoke detector at unmanned area HEMaintenance Improvement Project
15SIP - Dust Collector Display Parameter DC3Maintenance Improvement Project
16Install bracket for solenoid valve batch charger 1-4Maintenance work
17Energy saving - CE compressed air energy optimizationMaintenance Energy Saving Project
18Energy saving - Main water pump flow optimization inverterMaintenance Energy Saving Project
19SCR weighing batch plant replacementMaintenance work
20Attend Technical Seminar Bag Filter competency for CPD December 2026Maintenance Competency CePBFO
21Conduct training class for Dust Collector to renew CPD November 2026Maintenance Competency CePBFO
22Glass level camera new replacement (CAPEX)Maintenance Improvement Project
23Flowmeter Installation for Airflow Verification and Dedicated CEMS UPS​ (CAPEX)Maintenance Improvement Project
24Hot end transmitter calibrationMaintenance work
25Submit CPD point for Bag Filter competency (CePBFO)CPD Summary report
26Coordinate and plan Training/briefing SOP power failure DG Run (Week 45)Maintenance Training
27Cullet Vibrator 3B suspect winding Finding - amp abnormalPM checking (checksheet) Finding
28Dust Collector 2 Finding - Impeller abnormal sound and purging malfunctionPM checking (checksheet) Finding
29MFO Left side Finding - Air regulator valve leak/brokenPM checking (checksheet) Finding
30Mixer 3 Finding - Plate motor abnormal sound (fan motor area)PM checking (checksheet) Finding
31Screw CV Dolomite Finding - Motor insulation test low under 1Mohm need to checkPM checking (checksheet) Finding
32Screw CV Limestone Finding - Motor insulation test low need to checkPM checking (checksheet) Finding
33Silica sand CV 1 Finding - Motor abnormal sound needs to replacePM checking (checksheet) Finding
34Update and compile PM Dust collector November 2026Performance Monitoring Report
35Install new filter for panel inverter combustion fan no.1 & 2Maintenance work

Purchase item register

Track model/part number and purchasing status separately from engineer tasks and maintenance records.

No.Purchase item / taskModel / part numberSupplier / ContractorQuantityStatusActions
1Repair vibrator motor live bottom hopper mixer 2Vibrator motorAsia Marine1
2Temperature controller (CVD)Eurotherm 3500 seriesWatlow1
3SCR eurotherm 250AEurotherm SCRWatlow2
4Braking resistorYaskawa LKEB-42P2 OPYaskawa2
5TC Lehr Top A,B,C zoneLocal Type KCTAE2
6Differential PressureHK DPT-2WCTAE1
7ITV cctv cameraDahua SDZ4032-HNR-ZBEpitronic2
8SCR eurotherm 160AEurotherm SCRWatlow2
9Airflow controller, sensor & cableSIGMA05-HS1D2GA6U1, EE671CTAE1
10PSU StackerBlock PC-0324-200-2Maxzone2
11Catridge filter Dust RemoverREDClean NFRAAF8
12Repair U magnet Mixer 3U magnetAsia Marine1
13IPC Tester for ITV camera configurationIPC Tester All-in-oneKVC1
14Front tweel sensorShinko Electric LV5-100-MSA-SLBNSGE1
15Switch amplifier for water spray mixerKFA6-SOT2-EX2KVC1
16ITV Monitor with bracketDELL 31.5" S3225QSOptimized4
17MicrophonePM222Lyewee5
18Glass catridge fuse5A TRS Pro20
19Purchase cyclo drive 1.5kw with brakeCHHM2-6145-B-87Sumitomo1
20Refurbish/Repair Lehr Heater 9KWLehr Heater 9KW A Zone Top D6LES1
21Refurbish/Repair Lehr Heater 10KWHeater 10KW A Zone Top C2LES1
22Filter lens for glass level cameraMIDOPT NI060-30.5ESM2
23Yokogawa transmitter calibrationSVC01TS1001Yokogawa3
24Solenoid valve for water spray mixerPU225-20A-AC220VKVC1
25High temperature glass firing & gasketGLASS SIZE: 4MM , 580 DEGREELES1
26RJ45 CAT6A SHIELDEDZOERAX RJ45LES20
27Graphic Terminal Inverter SchneiderVW3A1111KVC2
28Graphic Terminal Mounting Inverter SchneiderVW3A1112KVC2
29Bush Male 2" X Female 3/4"Size Male 2" X Female 3/4"RS Pro2
30MicroSD Memory CardKingston 64GBCTAE2
31Waveshare USB to RS485 BidirectionalWaveshare USB to RS485LES1
32Airflow controller and pitot tubeEYC PHD330-301-M-D1, AFMP-042-710mmREX1
33Cable for microphoneBelden 8761CTAE50
34Lehr SO2 control valve rotate valve and calibration workSamson 3277Azbil1
35Thermometer Dust CollectorUNIJIN T110—1
36Refurbish/Repair Lehr Heater 9KWLehr Heater 9KW A Zone Top B1LES1
37Plastic Tubing Dust Collector SIPFesto PUN-H-8X1,25-NTKVC100
38Repair/Service Exchange Valve FiringExchange Valve 4P LeftYellico1
39Thermocouple Type K CVD CanisterType K L = 1200MMCTAE2
40Strainviewer sensorTelemecanique XUB5APANM12—2
41Angle Grinder toolsMakita GA4040C—1

Maintenance reports

Review performance and print a clean report or save it as PDF.

Total maintenance records45
Completion rate60%
Overdue tasks10

Maintenance register

Generated 24/11/2026, 10:24:02 am

No.Job / TaskPlanned date (From – To)FrequencyManpowerStatusNotes
1
⚙
Cleaning hopper Dust CollectorDust Collector 1 · PM Routine
24 Oct 2026MonthlyWan MahassanCleaning hopper due to DP gauge above limit 150mmWG. suspect filter bag choked.
2
⚙
Cleaning hopper Dust collectorDust Collector 2 · PM Routine
24 Oct 2026MonthlyWan MahassanCleaning hopper due to DP gauge above limit 150mmWG
3
⚙
H2 analyser line 1 & 2 calibration by OGMH2 analyser Gas Mixing Room · TRT/Hot Clean
26 Oct 2026YearlyOGM & HaikalH2 analyser line 1 & 2 calibration by OGM annually
4
⚙
Top Roll 5A Swap with spare unitTop Roll 5A · TRT/Hot Clean
26 Oct 2026QuarterlyHaikalTop Roll 5A cancelled swap due to spare unit problem with up & down movement stuck
5
⚙
Spare part list ElectricalBatch Plant area · PM Routine
26 Oct 2026 – 30 Oct 2026DailyHaikalPM routine checking for spare part list electrical part
6
⚙
Cleaning Hopper Dust CollectorDC Main BP · PM Routine
27 Oct 2026MonthlyWan MahassanCleaning hopper due to DP gauge increases above limit 150mmWG. Suspect choked
7
⚙
PM CheckingCullet Conyevor system · PM checking (Checksheet)
28 Oct 2026MonthlyHaikalPM checking routine monthly frequency
8
⚙
LOTO Mixer 3Mixer 3 · Support & assist Operation/Mechanical
28 Oct 20262weekHaikalLOTO Mixer 3 for cleaning and servicing by mechanical team
9
⚙
Replace exchange valveFiring Exchange valve 4P Left · Support & assist Operation/Mechanical
29 Oct 2026One-offHaikalProd finding exchange valve 4P left back fire. plan to replace with spare
10
⚙
Cleaning ITV PanelITV Camera CCTV · PM Routine
30 Oct 2026MonthlySyed & HaikalCleaning dust inside ITV panel to ensure system function well
11
⚙
Replace ITV monitor - 4pcsITV Camera CCTV system · Corrective/Repair Maintenance
02 Nov 2026One-offHaikal & FazreenReplace ITV Monitor 4pcs due to wear & tear
12
⚙
PM checking Batch PlantBatch Plant area · PM checking (Checksheet)
02 Nov 2026MonthlyHaikalPM checking routine monthly frequency
13
⚙
5S housekeepingAll Dust Collector · 5S & Housekeeping
03 Nov 2026One-offWan Mahassan & Team5S housekeeping all dust collector. preparation for DOE audit
14
⚙
Assit Swap Top roll 5A & 5CTop Roll 5A & 5C · TRT/Hot Clean
03 Nov 2026QuarterlyShift UtilityReplace with spare unit Top roll 5A & 5C
15
⚙
Check TC A zone Top Right & Adjust positionLehr TC A zone Top Right · TRT/Hot Clean
03 Nov 2026One-offProductionFinding Trend Temp Right fluctuate. A zone Top Right TC
16
⚙
Assist Changeover blower BathBlower HP, BBCF · TRT/Hot Clean
03 Nov 20262weekShift UtilitySupport and assist prod to changeover blower BBCF & HP
17
⚙
Check Heater A zone Top B, C, DLehr Heater A zone Top B, C, D · TRT/Hot Clean
03 Nov 2026One-offSyed & HaikalTemperature Present Value cannot reach Set Value. different about 2~3 degree
18
⚙
Check damper C zone bottom rightLehr damper C zone bottom Right · TRT/Hot Clean
03 Nov 2026MonthlySyed & HaikalRequest from prod issue with auto damper malfunction.
19
⚙
Replace heater A zone Top B1Lehr Heater A zone Top B1 (FR1) · TRT/Hot Clean
03 Nov 2026One-offSyed & HaikalFinding heater bend and touch the glass issue
20
⚙
PM checking Lehr areaLehr area · PM checking (Checksheet)
03 Nov 2026MonthlySyed & HaikalPM checking routine monthly frequency
21
⚙
SIP project Smoke DetectorHot end Smoke Detector · Safety Improvement Plan (Special Job)
04 Nov 2026 – 07 Nov 2026One-offSyed & Haikal1. Install smoke detector, panel smoke detector 2. Check route new cable for Lehr area
22
⚙
Test and Replace blower fanEV Weighing Dolomite · Corrective/Repair Maintenance
04 Nov 2026 – 05 Nov 2026One-offWan Mahassan/Syed & HaikalFinding blower fan abnormal sound suspect bearing motor damaged.
23
⚙
PM checking Batch PlantSilica sand area · PM checking (Checksheet)
05 Nov 2026MonthlySyed & HaikalPM checking routine monthly frequency
24
⚙
Repair install bracket solenoid valveBatch Charger 1-4 · PM Finding Repair
10 Nov 2026 – 14 Nov 2026One-offSyed & HaikalFinding by Masa-san: The solenoid valve batch charger 1-4 is not properly mounted.
25
⚙
PM checking batch plant areaBatch Plant area · PM checking (Checksheet)
10 Nov 2026MonthlySyed & HaikalPM checking routine monthly frequency
26
⚙
Replace Lehr Break sensor centreLehr Break 1 · TRT/Hot Clean
11 Nov 2026One-offSyed & HaikalFound sensor for Lehr Break 1 melted and malfunction
27
⚙
Check Heater A zone Top & BottomLehr Heater A zone Top & Bottom · TRT/Hot Clean
11 Nov 2026One-offSyed & HaikalPM checking TRT-Routine. Finding ATC C3 cable snapped. repairs replace loop cable. done
28
⚙
Replace Thermocouple Tin Bay 13LTin Bay 13L · TRT/Hot Clean
11 Nov 2026One-offShift UtilityProd finding temp tin bay 13L low and different than tin bay 13R.
29
⚙
PM checking cullet conveyor systemCullet Conveyor system · PM checking (Checksheet)
12 Nov 2026MonthlySyed & HaikalPM checking routine monthly frequency
30
⚙
PM checking batch plant areaBatch Plant area · PM checking (Checksheet)
16 Nov 2026MonthlySyed & HaikalPM checking routine monthly frequency
31
⚙
Weight test and calibrationWeighing system Raw material · PM Routine
17 Nov 20266monthSyed & HaikalWeight test and calibration for raw material every 6month (Silica sand 1, Silica sand 2, Dolomite, Soda Ash, Limestone & Salt cake
32
⚙
PM checking Distributor, Batch & B+C areaDistributor, Batch & B+C area · PM checking (Checksheet)
18 Nov 2026MonthlySyed & HaikalPM checking routine monthly frequency
33
⚙
Replace Lehr Break sensor centre & rightLehr Break 1 · TRT/Hot Clean
19 Nov 2026One-offSyed & HaikalFound sensor for Lehr Break 1 melted and malfunction (Centre & Right)
34
⚙
Assist Changeover blower BathBlower HP, BBCF · TRT/Hot Clean
19 Nov 20262weekShift UtilitySupport and assist prod to changeover blower BBCF & HP
35
⚙
Assit Swap Top roll 6A & 6CTop Roll 6A & 6C · TRT/Hot Clean
19 Nov 2026QuarterlyShift UtilityReplace with spare unit Top roll 5A & 5C
36
⚙
PM checking bath areaBath area · PM checking (Checksheet)
20 Nov 2026MonthlySyed & HaikalPM checking routine monthly frequency
37
⚙
Cleaning and Servicing EV weighing DolomiteEV weighing Dolomite · PM Routine
23 Nov 2026MonthlyWan MH & TeamCleaning and servicing routine monthly
38
⚙
Replace blower fan EV weighing DolomiteEV weighing Dolomite · PM Finding Repair
24 Nov 2026MonthlyWan MH & TeamReplace blower fan. Finding blower fan abnormal sound due to shaft motor wobbling.
39
⚙
Annual servicing & calibration5D Scanner · TRT/Hot Clean
25 Nov 2026 – 27 Nov 2026YearlyJoseph & Zuhairi5D Scanner annual calibration & servicing. checking 5D scanner slave PC new version problem need to configuration setting.
40
⚙
Repair install bracket solenoid valveBatch Charger 1-4 · PM Finding Repair
25 Nov 2026 – 27 Nov 2026One-offSyed & HaikalFinding by Masa-san: The solenoid valve batch charger 1-4 is not properly mounted.
41
⚙
O2 analyser calibration by OGMO2 analyser for N2 & H2 · PM Routine
26 Nov 2026YearlyOGM/Syed & HaikalO2 analyser calibration by OGM annually
42
⚙
Assist Changeover blower BathBlower HP, BBCF · TRT/Hot Clean
26 Nov 20262weekShift UtilitySupport and assist prod to changeover blower BBCF & HP
43
⚙
Cleaning and Servicing EV gathering CV & mixerEV gathering CV & mixer · PM Routine
27 Nov 2026MonthlyWan MH & TeamCleaning and servicing routine monthly
44
⚙
Replace exchange valveFiring Exchange valve 4P Right · Support & assist Operation/Mechanical
27 Nov 2026One-offSyed & HaikalProd finding exchange valve 4P right back fire. plan to replace with spare
45
⚙
Lay new cable for emergency siren and testEmergency Siren · PM Finding Repair
30 Nov 2026 – 02 Dec 2026One-offSyed & HaikalCheck and do assessment for route cable power supply for emergency siren furnace
To save as PDF, select Print / Save PDF and choose Save as PDF as the printer destination in your browser's print dialog.

Data & backup

Import, export and maintain your local data safely.

Import maintenance data

Load records from a CSV file.

↑

Use the CSV template to see the expected column names. You can choose to merge imported records or replace the current list.

Recommended columns: equipment, task, plannedDate, plannedDateTo, excludePlannedDates, section, jobType, frequency, assignedTo, status, notes. Dates should use YYYY-MM-DD.

Export & backup

Download a copy of your maintenance records.

↓

Update the existing dashboard HTML file with your current records, or export CSV for spreadsheet backup.

Use Save As for the first save and choose where to store the dashboard HTML. After that, Auto Save overwrites the same selected file. Auto Save is unavailable until a file has been selected with Save As. Your browser may ask for write permission. This application does not upload your data to a server.

Local storage status

Records are saved in this browser profile.

Local only
Records stored45
Storage methodBrowser
Cloud syncNot enabled

Clearing data cannot be undone unless you have exported a backup. This action only affects this application's records in this browser.

Record updated.

MaintainPro Cloud

Masukkan PIN untuk mengakses dashboard.

Akses peribadi. Jangan kongsi PIN dengan orang lain.